Work Accomplished and Ongoing

Phase 1: Accomplished!

Phase 1 of the auditorium renovation, completed between 2006 – 2008, included replacing the torn and decrepit stage curtains; replacing/upgrading the worst of the auditorium’s broken and torn seats; purchasing a new portable dance floor and sound system, both of which can be brought out and used when they are needed; purchasing much-needed stage lighting; and building a locked cabinet for Tech’s grand piano.

Individuals, Foundations, the Oakland School District and State of California contributed $125,000 to make the improvements in Phase 1.

Phase 2

Phase 2 of the auditorium renovation plan is scheduled to run from 2009 – 2011.  It includes making any necessary repairs to the rigging, purchasing and installing a sound system, making desperately needed acoustic enhancements, upgrading the dimmer board and lighting instruments, constructing a sound and lighting booth, installing a backstage monitoring system, painting the auditorium, and painting the lobby and creating a gallery space/showcase for Tech’s visual arts students and for the gorgeous posters for Tech’s drama productions and photos from performing arts productions over the years.

Auditorium Renovation Fundraising-Phase Two

$: 513,000 / 530,000 (97%)

The total cost of Phase 2 is estimated at $544,800.  We currently need $355,000 to complete Phase 2.

For more information, please contact auditorium@oaklandtech.com.

Give a gift today to honor the future – help us renovate Tech’s auditorium!

Return to the Auditorium Renovation main page